Welcome to our websites!

Operating procedures for corrugating machine

Operating procedures for corrugating machine

1. turn on the power supply of the equipment and check whether the power supply is abnormal.

2. turn on the power supply or valves of auxiliary parts (air compressor: steam transfer valve, etc.) the air compressor pressure is 6-9/mpa and the steam pressure is 7-12/mpa

3. test run, start the equipment and check whether there is abnormal reaction.

4. equipment preheating. When the equipment is running, turn the corrugated roll slowly to prevent the deformation of the corrugated roll under the condition of heating and self weight.

5. prepare materials, clean the pulp basin, and clean the dry glue block inside to avoid glue blocking. Put the glue into the pulp basin to check whether the glue quality is qualified and move the rubber baffle to the required position: understand the order status according to the production management system, and check whether the supplied base paper is consistent with the order. (width, gram weight, damage, color, paper direction)


Post time: Jun-22-2022